Environmental Commitment
Full Environmental Clearance Certificate.
Proper implementation of the Environmental Management System based on Environmental Policy, Carbon Reduction Plan and Environmental Impact Assessments..
 
Wastewater Effluent
Treatment Plant: to neutralize
the water leaving the factory.
Drinking Water Treatment
Plant: to improve the water
quality via UV treatment,
multistage filtration, pH
control and oxidation.
In-house Environmental Lab
consisting of professional
measurement equipment for
water, noise and air quality
monitoring and control.
 
Implementation of the ‘Green Energy Management Plan’.
Electricity, Fuel, Gas, Raw Material consumptions are measured, solutions for minimizations
Proper implementation of the Environmental Management System based on Environmental Policy, Carbon Reduction Plan and Environmental Impact Assessments..
are developed, awareness is raised amongst employees and actions taken for improvements. a
Rainwater is collected and reused as water for the Fire Hydrant System.
ESL uses energy efficient and highly productive automatic Knitting Machines.
S-LED (NewGen Super LED) Lights are quickly replacing the conventional tube lights at the factory premises. Compared to tube lights, each S-LED is Twice as brighter and has a 7 times longer life time. This is decreasing the electricity consumption (for light) and bills paid by 80% and the heat generated from light by 99%!